Copyright © Philip M. Parker, INSEAD. Terms of Use.

PRODUCTION SCHEDULER

Specialty Definition: PRODUCTION SCHEDULER

DomainDefinition

Occupations

Schedules and coordinates flow of work within or between departments of manufacturing plant to expedite production: Reviews master production schedule and work orders, establishes priorities for specific customer orders, and revises schedule according to work order specifications, established priorities, and availability or capability of workers, parts, material, machines, and equipment. Reschedules identical processes to eliminate duplicate machine setups. Distributes work orders to departments, denoting number, type, and proposed completion date of units to be produced. Confers with department supervisors to determine progress of work and to provide information on changes in processing methods received from methods or engineering departments. Compiles reports concerning progress of work and downtime due to failures of machines and equipment to apprise production planning personnel of production delays. Maintains inventory of materials and parts needed to complete production. May expedite material [MATERIAL COORDINATOR (clerical) 221.167-014]. May expedite production of spare parts and establish delivery dates for spare parts orders and be designated Spares Scheduler (clerical). May coordinate and expedite work in automobile repair and service establishment from control tower, using public address system, and be designated Work Coordinator, Tower Control (automotive ser.). May use computer system to track and locate production units. (references)

Source: compiled by the editor from various references; see credits.

Top     

Frequency of Internet Keywords: PRODUCTION SCHEDULER

The following statistics estimate the number of searches per day across the major English-language search engines as identified by various trade publications. Hyperlinks lead to commercial use of the expression at Amazon.com.
 
ExpressionFrequency
per Day

production scheduler

4

production scheduler job description

3
Source: compiled by the editor from various references; see credits.

Top     

Anagrams: PRODUCTION SCHEDULER

Scrabble® Enable2K-Verified Anagrams

Words within the letters "c-c-d-d-e-e-h-i-l-n-o-o-p-r-r-s-t-u-u"

-5 letters: superconducted, superconductor.

Source: compiled by the editor from various references; see credits.

SCRABBLE® is a registered trademark. All intellectual property rights in and to the game are owned in the U.S.A and Canada by Hasbro Inc., and throughout the rest of the world by J.W. Spear & Sons Limited of Maidenhead, Berkshire, England, a subsidiary of Mattel Inc. Mattel and Spear are not affiliated with Hasbro.

Top     

Alternative Orthography: PRODUCTION SCHEDULER


Hexadecimal (or equivalents, 770AD-1900s) (references)

50 52 4F 44 55 43 54 49 4F 4E      53 43 48 45 44 55 4C 45 52

Leonardo da Vinci (1452-1519; backwards) (references)

    

Binary Code (1918-1938, probably earlier) (references)

01010000 01010010 01001111 01000100 01010101 01000011 01010100 01001001 01001111 01001110 00100000 01010011 01000011 01001000 01000101 01000100 01010101 01001100 01000101 01010010

HTML Code (1990) (references)

&#80 &#82 &#79 &#68 &#85 &#67 &#84 &#73 &#79 &#78 &#32 &#83 &#67 &#72 &#69 &#68 &#85 &#76 &#69 &#82

ISO 10646 (1991-1993) (references)

0050 0052 004F 0044 0055 0043 0054 0049 004F 004E      0053 0043 0048 0045 0044 0055 004C 0045 0052

Encryption (beginner's substitution cypher): (references)

505249385537544349482533742393855463952

Top     



INDEX

1. Expressions: Internet
2. Anagrams
3. Orthography
4. Bibliography


  

Copyright © Philip M. Parker, INSEAD. Terms of Use.