Copyright © Philip M. Parker, INSEAD. Terms of Use.

| Domain | Definition |
Mining | The number of cubic yards of gravel that can be broken down and sent through the sluice by 1 miner's inch of water for 24 h. It depends upon the height of the bank, the character of the gravel and the bedrock, the grade of the bedrock, the type of sluice, and the pressure of the water. In well-rounded gravel without large stones, the duty of the miner's inch is from 4.5 to 6 yd3 (3.3 to 4.6 m3 ) of gravel for 24 h. Under less favorable conditions, the duty may range from 2.8 to 4.6 yd 3 (2.1 to 3.5 m3 ) for 24 h. See also:miner's inch. (references) |
Source: compiled by the editor from various references; see credits. | |
Hexadecimal (or equivalents, 770AD-1900s) (references)44 55 54 59      4F 46      54 48 45      4D 49 4E 45 52 27 53      49 4E 43 48 |
| Leonardo da Vinci (1452-1519; backwards) (references)
|
Binary Code (1918-1938, probably earlier) (references)01000100 01010101 01010100 01011001 00100000 01001111 01000110 00100000 01010100 01001000 01000101 00100000 01001101 01001001 01001110 01000101 01010010 00100111 01010011 00100000 01001001 01001110 01000011 01001000 |
HTML Code (1990) (references)D U T Y   O F   T H E   M I N E R ' S   I N C H |
ISO 10646 (1991-1993) (references)0044 0055 0054 0059      004F 0046      0054 0048 0045      004D 0049 004E 0045 0052 0027 0053      0049 004E 0043 0048 |
Encryption (beginner's substitution cypher): (references)3855545924940254423924743483952953243483742 |
| 1. Orthography 2. Bibliography |
Copyright © Philip M. Parker, INSEAD. Terms of Use.