Copyright © Philip M. Parker, INSEAD. Terms of Use.

| Domain | Definition |
Occupations | Compiles, classifies, and keeps reports and records of tests performed by relay field-test crews and transmits supervisor's instructions to relay test crews of electric power company: Prepares reports and verifies accuracy of data submitted by field-test crews in company plant and substation installations. Prepares reports on maintenance and new-installation tests performed at customer's substation. Classifies, files, and issues blueprints and related documents used on construction work by field-test crews. Verifies accuracy of calculations on test reports, such as power or current transformer ratio, circuit breaker time-performance, and transformer winding resistance, using calculator. Summarizes daily field-test reports and posts data in logbooks. Relays supervisor's instructions to test crews, using communication system. (references) |
Source: compiled by the editor from various references; see credits. | |
Hexadecimal (or equivalents, 770AD-1900s) (references)52 45 4C 41 59 2D 52 45 43 4F 52 44      43 4C 45 52 4B |
| Leonardo da Vinci (1452-1519; backwards) (references)
|
Binary Code (1918-1938, probably earlier) (references)01010010 01000101 01001100 01000001 01011001 00101101 01010010 01000101 01000011 01001111 01010010 01000100 00100000 01000011 01001100 01000101 01010010 01001011 |
HTML Code (1990) (references)R E L A Y - R E C O R D   C L E R K |
ISO 10646 (1991-1993) (references)0052 0045 004C 0041 0059 002D 0052 0045 0043 004F 0052 0044      0043 004C 0045 0052 004B |
Encryption (beginner's substitution cypher): (references)52394635591552393749523823746395245 |
| 1. Orthography 2. Bibliography |
Copyright © Philip M. Parker, INSEAD. Terms of Use.